Production scheduling /
Saved in:
Other Authors: | , |
---|---|
Format: | Electronic eBook |
Language: | English French |
Published: |
London : Hoboken, NJ :
ISTE ; John Wiley & Sons,
2008.
|
Series: | Control systems, robotics and manufacturing series.
|
Subjects: | |
Online Access: | CONNECT |
MARC
LEADER | 00000nam a2200000 a 4500 | ||
---|---|---|---|
001 | in00006118612 | ||
006 | m o d | ||
007 | cr cn||||||||| | ||
008 | 090723s2008 enka ob 001 0 eng d | ||
005 | 20240125143147.2 | ||
020 | |a 9780470611050 | ||
020 | |a 9781601199294 |q (electronic bk.) | ||
020 | |a 1601199295 |q (electronic bk.) | ||
020 | |a 9780470393635 |q (electronic bk.) | ||
020 | |a 0470393637 |q (electronic bk.) | ||
020 | |a 0470611057 | ||
020 | |a 1848210175 | ||
020 | |a 9781848210172 | ||
020 | |a 1282164953 | ||
020 | |a 9781282164956 | ||
024 | 7 | |a 10.1002/9780470611050 |2 doi | |
035 | |a (NhCcYBP)e80fa363d91f485b9a695405a0a7a4bb9780470611050 | ||
035 | |a 1wileyeba9780470611050 | ||
037 | |b Knovel Corporation |n http://www.knovel.com | ||
040 | |a NhCcYBP |b eng |c NhCcYBP | ||
041 | 1 | |a eng |h fre | |
050 | 4 | |a TS157.5 |b .O7313 2008eb | |
082 | 0 | 4 | |a 658.5/3 |2 22 |
130 | 0 | |a Ordonnancement de la production. |l English. | |
245 | 1 | 0 | |a Production scheduling / |c edited by Pierre Lopez, François Roubellat. |
260 | |a London : |b ISTE ; |a Hoboken, NJ : |b John Wiley & Sons, |c 2008. | ||
300 | |a 1 online resource (xii, 375 pages) : |b illustrations | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
490 | 1 | |a Control systems, robotics and manufacturing series | |
504 | |a Includes bibliographical references and index. | ||
500 | |a Wiley EBA |5 TMurS | ||
588 | 0 | |a Print version record. | |
505 | 0 | |a Basic concepts and methods in production scheduling / Patrick Esquirol and Pierre Lopez -- Metaheuristics and scheduling / Marino Widmer, Alain Hertz, and Daniel Costa -- Genetic algorithms and scheduling / Marie-Claude Portmann and Antony Vignier -- Constraint propagation and scheduling / Patrick Esquirol, Pierre Lopez, and Marie José Huguet -- Simulation approach / Gérard Bel and Jean-Bernard Cavaillé -- Cyclic production scheduling / Jean-Claude Gentina, Ouajdi Korbaa, and Hervé Camus -- Hoist scheduling problem / Christelle Bloch [and others] -- Shop scheduling with multiple resources / Jean-Charles Billaut [and others] -- Open shop scheduling / Christian Prins -- Scheduling under flexible constraints and uncertain data : the fuzzy approach / Didier Dubois, Hélène Fargier, and Philippe Fortemps -- Real-time workshop scheduling / Christain Artigues and François Roubellat. | |
650 | 0 | |a Production scheduling. | |
650 | 0 | |a Inventory control. | |
700 | 1 | |a Lopez, Pierre. | |
700 | 1 | |a Roubellat, François. | |
730 | 0 | |a WILEYEBA | |
776 | 0 | 8 | |i Print version: |a Ordonnancement de la production. English. |t Production scheduling. |d London : ISTE ; Hoboken, NJ : John Wiley & Sons, 2008 |z 9781848210172 |w (DLC) 2007043950 |
830 | 0 | |a Control systems, robotics and manufacturing series. | |
856 | 4 | 0 | |u https://ezproxy.mtsu.edu/login?url=https://onlinelibrary.wiley.com/book/10.1002/9780470611050 |z CONNECT |3 Wiley |t 0 |
949 | |a ho0 | ||
975 | |p Wiley UBCM Online Book All Titles thru 2023 | ||
976 | |a 6006612 | ||
998 | |a wi |d z | ||
999 | f | f | |s 04b47723-8d2f-4f86-bf60-ded328846a12 |i 04b47723-8d2f-4f86-bf60-ded328846a12 |t 0 |
952 | f | f | |a Middle Tennessee State University |b Main |c James E. Walker Library |d Electronic Resources |t 0 |e TS157.5 .O7313 2008eb |h Library of Congress classification |